Launch and Recommission

Launching is scheduled to start at the end of April and continues through the months of May and June. Please schedule your preferred launch and mast stepping date with the marina office after filling out the form bellow.

Owners are expected to be present at their launch in order to take their boat to the assigned slip. For the owners that have a cradle, we ask that you remove the cradle pads once your boat is lifted up during launch and take home with you. We are not responsible for the pads and do not have suitable storage available.

Prior to Launching, please read the Boaters Launch Checklist and Customer Handbook on our Forms & Links page.

For sailboats, masts are expected to be prepared by the owner in advanced and is only allowed 30 minutes for the standard fixed cost. Any additional time required will be charged. Please refer to the mast stepping procedure

2023-24 Loyalist Cove Marina Price List

Launch fees are due at time of launching.

Recommission

For Recommission we ask that any lockers or storage cabinets that give access to pumps, plumbing and components should be cleared out and open. The customer will be charged for the time to clear out areas if the technicians needs access to winterize. Please refer to the 2024 Boaters Launch Checklist

Launch/ Recommission Form

Launch Service(required)

Do you Require Shrink-Wrap Removal

Do you Require Recommission (required)

What Engines Require Recommission?(required)

Do you Require any Fluid Changes?(required)

What Plumbing is requires Recommission? (Specify numbers in box below)(required)